Family Bathroom Renovation
A full family bathroom strip-out and renovation with underfloor heating and a new layout.
Family Bathroom Renovation in Shoreham-by-Sea, built in 3 weeks, completed April 2025 by Builders-OS. Budget band: Under £10k. A full family bathroom strip-out and renovation with underfloor heating and a new layout.
The brief
The existing bathroom was dated and awkwardly laid out, with the bath blocking natural light from the window.
The challenge
Moving the bath meant rerouting waste pipework within a limited void depth under the floor.
What we did
We redesigned the layout to make better use of the space, rerouted plumbing to allow the new layout, and added underfloor heating and full-height tiling.
The result
A completely transformed family bathroom, finished in 2.5 weeks.
"It doesn't even feel like the same room. The underfloor heating was the best suggestion they made."
Project facts
- ServiceBathroom Renovations
- LocationShoreham-by-Sea
- PropertySemi-detached house
- Duration3 weeks
- Budget bandUnder £10k
- CompletedApr 2025